A full road reconstruction of Brock Street from St. Catharines Street to the end of Brock St., in the Township of West Lincoln is planned for construction start in 2021. This will include a watermain replacement and storm sewer replacement.
The road will be fully excavated for the purpose of these works. The road will be reconstructed and fully resurfaced, including new curb and gutter, and sidewalk. No major changes have been made to the surface features of the overall road design; small improvements have been made. These changes have been put in place for improvements in the Town’s best interest.
Jan 14, 2022 - Project Complete. Under a 1 year maintenance period.
June 28, 2021 - Construction start.
Apr 26, 2021 - Tender Awarded by Council to Stonecast Contracting Limited of Stoney Creek.
Mar 5, 2021 - Tender Closed
Feb 1, 2021 - Virtual Public Information Centre date announced.
Jan 21, 2021 - Detail design is complete. Information on a virtual Public Information Centre (P.I.C.) will be posted soon, and notifications sent out to business and residents affected.
A virtual public information centre is a forum for the Township to communicate upcoming construction projects with the affected residents. The residents can look at the design drawings, and ask questions about the project, and how it will affect their business, property or life. Due to the current pandemic, this PIC will be done virtually via a Teams meeting. Residents that have questions must register for the meeting and ask their question(s) via email(see below). Once registered, residents will receive a link to the virtual meeting via email. When registering, the following information is required in your email: Full name, address, phone number, and question(s).
Here is the link to download (4 MB) the proposed construction drawings. A PDF reader will be required to view.
Meeting Date: February 9, 2021, 6:30 PM to 8:00 PM
Registration Contact: Mark Mascioli, C.E.T., LEL, Project Engineer, Associated Engineering Ltd., masciolim@ae.ca
Meeting Registration Deadline: February 8 @ 2 PM
Additional Work |
|
Traffic Access |
|
Notifications |
|